Perception stack acceleration.
14-engineer pod · 8 months · TRL 6→7 · ROS2 / NVIDIA Isaac. Senior Consultant from autonomous-systems vertical; Werkvertrag scope: perception module integration with downstream control. No onsite Einsatz; Projektleiter executed all in-jurisdiction interactions.
Enterprise LLM platform.
9-engineer pod · 6 months · vLLM / RAG production. Werkvertrag scope: production-grade RAG pipeline, vector index, eval harness. AVV under Art. 28 DSGVO; AWS Frankfurt processing region.
S/4HANA migration programme.
3-pod programme · 12 months · BTP / CAP integration. Programme-level Projektleiter; one Senior Consultant per ABAP, BTP, and Fiori track. Quarterly steering with Geschäftsführung. Full Werkvertrag posture maintained.
OPC-UA / MES bridge.
5-engineer pod · 9 months · OPC-UA / MES / edge orchestration. Senior Consultant from Industry 4.0 vertical; integration of legacy SCADA into greenfield MES. Documented monthly Aufwandsbericht.
IEC 62304 audit-ready stack.
7-engineer pod · 10 months · IEC 62304 / ISO 13485-aligned DevOps. Senior Consultant carried prior MDR-grade experience. Full traceability matrix delivered alongside the Werk; submission-ready artefacts.
Sensor fusion stack (anonymized).
4-engineer pod · 6 months · sensor fusion / edge inference. Dual-use export awareness encoded in scope. Strict no-onsite posture; all interactions through the Stuttgart Projektleiter.
Engagement details, named Mandanten, and quantified outcomes disclosed under NDA upon request. niogod™ does not publish unauthorized client logos or fabricated quotes.