// Open mandates

Engineer for the world's most demanding deep-tech buyers.

niogod™ deploys senior Indian engineering talent into DACH deep-tech mandates under institutional Werkvertrag protocols. We do not place freelancers. We engineer pods.

Who we hire.

// Tier-1 institutional alumni

// Background

Tier-1 alumni networks across India.

IIT, BITS, IIIT, NIT, ISI, IISc — or equivalent institutional background. 3–15 years in production deep-tech systems. Track record of shipped systems, not just resumes.

// Language

Mandatory C1+ written English.

Working German at A2+ is a strong plus and a hiring tiebreaker for Senior Consultant roles. The Projektleiter is the only required C1 German speaker; engineers communicate in English to the Projektleiter and asynchronously to the Mandant.

How we work.

// Long-term assignments · Werkvertrag-led

niogod™ engineers are not freelancers. Engagements are long-term, assignment-stable, and operate inside a sealed pod under a German Projektleiter. There is no client-direct freelance arrangement, no hourly time-tracking software, and no "bench-the-bench" rotation. The pod owes a Werk — defined deliverables under Abnahme — and the engineer's role is execution within that scope.

The Mandant interfaces only with the Projektleiter. Engineers receive technical direction from the Senior Consultant. This separation is contractual, not advisory.

Open mandates.

// Vertical · level · engagement type

// Robotics & Autonomous Systems

Senior Consultant — Robotics.

10+ yrs in ROS/ROS2, perception, SLAM, control, embedded Linux. View vertical profile →

// AI/ML — Applied & Enterprise

Senior Consultant — AI/ML.

10+ yrs production ML, MLOps, vLLM/RAG, vector DBs, NVIDIA stack. View vertical profile →

// Industrial Software · Industry 4.0

Pilot Engineer — Industrial.

OPC-UA, MES, SCADA, edge orchestration; Siemens TIA familiarity a plus. View vertical profile →

// SAP & Enterprise Platforms

Senior Consultant — SAP.

10+ yrs SAP S/4HANA, BTP, CAP, RAP, ABAP, Fiori, integration suite. View vertical profile →

Compensation philosophy.

// Upper decile of the Indian engineering market

niogod™ pays in the upper decile of the Indian engineering market because the German Werkvertrag economics support it. Engineers retain Indian residency, health, and tax structure. Compensation is fixed monthly under the Werkvertrag scope and indexed to seniority and vertical, not to hourly utilization. There is no "bench-or-billable" pressure.

Process.

// Five-stage vetting · sub-1% acceptance

// 01

Sourcing pool

Tier-1 institutional alumni networks and corporate alumni pools.

// 02

Algorithmic pre-filter

Tech-stack match, English/German communication, time-zone overlap.

// 03

Technical assessment

Pair-coding and system-design interview against a deep-tech case.

// 04

Senior Consultant review

Domain-fit gate, conducted by the relevant vertical lead.

// 05

Projektleiter culture-fit gate

Working style, written-communication clarity, escalation behavior.

End ratio: under 1% acceptance. Engineers who pass enter the active pool with assignment-grade documentation.

Apply.

Submit your application below. The niogod™ talent function will respond within 5 business days for candidates who pass the algorithmic pre-filter.

Select your date of birth
December
2025
December 2025
Sun Mon Tue Wed Thu Fri Sat
Frontend Engineer UI/UX & Web Development
Data Scientist Machine learning & analytics
ML Engineer Model development & deployment
MLops ML infrastructure & pipelines
DevOps CI/CD & cloud operations
AWS Architect Cloud architecture & design
Legal Consultant Compliance & contracts
C++ Developer and Linux Administrator (m/f/d) System Development & Administration
Machine Learning Engineer (m/f/d) for Autonomous Driving AI for Autonomous Systems
Visual SLAM and 3D Reconstruction Engineer (m/f/d) Computer Vision & 3D Mapping

Drag & drop your CV here

or click to browse (PDF, DOC, DOCX)

Choose File

Application Submitted!

Thank you for your interest. Our team will review your application and get back to you within 72 hours.